Thanks Shane. ![]()
Yeah the 531 concurrent is basically a combo of a max effort day and a dynamic day during the week. Tomorrow will be my dynamic effort bench day where I’ll either do 6 sets of 3 at FSL with red bands or 6 sets of 2 at SSL. I haven’t been doing the Dynamic Effort for squats recently as it was causing stress on the joints. Also, I haven’t been deadlifts at all recently so I can focus most of my energy on bench and squats. I’m using 531 for the weight progression percentages but do a lot of triples doubles and singles which is not really standard 531. Basically at this point I’m really running my own custom Frankenstein program.
Concurrent is basically a Westside concept of training max effort and speed and/or repetitions concurrently in the same training week. When most people talk about conjugate they really mean concurrent. Conjugate really involves rotating other movements for max effort (i.e. regular bench, swiss bar bench, overhead press, incline bench, etc.). Once I hit 405 on bench I plan to start doing more of that.